UCSD BFS - Dome Construction

DOME CONSTRUCTION RENOVATED THE 4TH FLOOR SUITE AT UCSD. THE GOAL OF THIS SHOOT WAS TO CAPTURE THE OFFICES, BREAK ROOM, OPEN WORK AREAS AND CONFERENCE ROOMS.

General Contractor: Dome Construction

Developer: JLL

Architect: Domus Studio

Engineers: Coffman Engineers

Furniture: BKM

Previous
Previous

Parco

Next
Next

Top 10 Projects of 2022 (so far...)